Industrial plant room with pump sets, pipework and valves

Karachi, Pakistan · Est. 2023

ZK EngineeringPumping and fire fighting equipment for Pakistani industry

We supply pumping equipment and fire fighting equipment to industry, commercial buildings, water utilities and the domestic market — working with consultants and contractors to select equipment for the requirement of the site.

About the company

Founded in 2023 by engineers with three decades of experience

ZK Engineering was formed by a group of professionals with more than three decades of experience in pumping systems and fire fighting engineering. We handle supply, installation, testing and commissioning, and maintenance, and we use design and selection software to size equipment against site requirements.

More about us
Centrifugal pump sets installed in a pumping station

Pumping products

Pumps for water, sewage, boosting and process duty

  • End suction centrifugal pumps
  • Vertical inline single and multistage pumps
  • Split case centrifugal pumps
  • Submersible pumps — borehole, sewage and drainage
  • Pressurized boosting systems, VFD and fixed speed
  • API 610 pumps
Pumping products

Fire products

Detection, suppression and fire pumps

  • Fire hydrant systems
  • Fire alarm and detection systems
  • Fire sprinkler and deluge systems
  • Foam and gas fire suppression
  • Kitchen fire suppression systems
  • Fire pumps to NFPA 20
Fire products

Authorized distributor

We represent two manufacturers in Pakistan

Certificates & agencies

Pumping · Germany

HOMA Pumpenfabrik

Submersible pumps for sewage, drainage and borehole service, along with associated control equipment.

Fire · United States

Peerless Pump Company

Fire pumps and packaged pump sets, including horizontal split case, multistage, vertical turbine and in-line units.

Current project

Sewage treatment plant pumping installation

Sewage treatment plant pumps, DHA Multan

Supply, installation and commissioning of sewage treatment plant pumps, with training of operational staff and one year of maintenance and repair support. Design, procurement and installation in 2024; commissioning, testing and maintenance through 2025.

All projects

Tell us what your site needs

Send us your requirement, drawings or duty point and our team will come back to you with an equipment selection and pricing.

Contact us